Building process · 3 min read · Updated 26/11/2026

What does a fixed-price building contract cover?

AE
Aladdin Elmir
Director, Medina Homes · Licensed builder 354409C
Kitchen with gold tapware and green island in a Gledswood Hills home
Short answer: A fixed-price contract sets one price in writing for the work described in the plans, specification and inclusions. The price only changes through written variations you agree to, or items the contract lists as provisional.

What's in the contract

  • The price, in writing, including GST
  • Plans and specification: what is being built
  • Inclusions: finishes, fixtures and appliances, so there are no surprises
  • Progress payment stages: what you pay and when
  • Start date and build time
  • Insurance: Home Building Compensation details

Deposits and progress payments

In NSW the deposit for residential building work is capped at 10% of the contract price. After that, you pay in stages as work is completed, for example slab, frame, lock-up, fixing and completion. Each claim matches a stage that is finished on site.

Home Building Compensation insurance

For residential building work over $20,000, the builder must have Home Building Compensation (HBC) cover in place before taking a deposit or starting work. It protects you if the builder can't finish the job or fix defects because they have died, disappeared, become insolvent or lost their licence.

How variations work

If you change something after signing, or something unexpected comes up, it is handled as a written variation with a price you approve before the work is done. No verbal surprises.

Provisional sums and prime cost items

Some items can't be priced exactly until later, such as rock excavation or a fixture you haven't chosen. These appear as allowances. Ask how many there are and what they cover; fewer allowances means more certainty.

How we do it

Because we design and handle selections in-house, most choices are locked in before you sign. That keeps the contract clear and the price firm. See how we build custom homes.

Not sure what your block allows?
Send us the address and we'll check it for you, free.
Check my block →

FAQs

What is the maximum deposit for building work in NSW?

10% of the contract price for residential building work.

When is Home Building Compensation insurance needed?

For residential building work over $20,000. The builder must have it before taking a deposit or starting work.

Can a fixed price change?

Only through written variations you agree to, or adjustments to items listed as provisional sums or prime cost items.

Sources
NSW Government: Contracts for residential building work
NSW Government: Protecting yourself in case of builder insolvency
This guide is general information, not legal or planning advice. Rules change; check your planning certificate.
AE
Written by Aladdin Elmir
Licensed builder (354409C) and property developer. Medina Homes designs and builds custom homes, duplexes and dual occupancy across South West Sydney. Custom home builder
Keep reading

Related guides.

Got a block? Find out what you can build on it.

Send us the address. We'll check the zoning, size and frontage and tell you what can go there. Free, no obligation.

Licence 354409C · Custom design and build

Where should we send what we find?

We only use your details to reply.

Thanks, we've got it.Here's what happens next:
  1. We check the zoning, lot size, frontage and any easements or overlays on your block.
  2. Aladdin calls you to talk through what can go there and what you want to do with it.
  3. If it suits, we meet on site and start the design.