Can my block take a duplex? A 9-point checklist

AE
Aladdin Elmir
Director, Medina Homes · Licensed builder 354409C
Corner double storey at twilight in Austral, built by Medina Homes
Short answer: Your block can usually take a duplex if the zoning allows dual occupancy, the lot meets the minimum size for your area, and nothing on the title or hazard maps rules it out. Your planning certificate (Section 10.7) is the place to start.

1. Check the zoning

Dual occupancy has to be permitted in your zone. Most residential zones in NSW allow it, but your council's Local Environmental Plan (LEP) is the final word. Your Section 10.7 planning certificate lists the zone and the planning rules that apply to your lot. Order it from council; it is the single most useful document for this checklist.

2. Measure the lot size

Every area has a minimum lot size for dual occupancy. A dual occupancy lodged as a development application (DA) can use a minimum lot size as small as 400 m². For a complying development certificate (CDC), your council's own minimum applies, and it can be higher.

3. Measure the frontage

Each home in a dual occupancy needs its own frontage to a public road. Narrow or battle-axe lots often struggle here, so check the frontage before you design.

4. Check for precinct rules

Parts of South West Sydney, including much of Austral and Leppington, sit in planned growth precincts with their own rules. These can change lot sizes, setbacks and what is permitted. The planning certificate will tell you which instrument applies.

5. Look for easements and services

Sewer mains, stormwater easements and rights of way can limit where you can build. Check your title plan and the Sydney Water sewer map before you design.

6. Check flooding and bushfire

Flood-prone or bushfire-prone land is usually excluded from complying development and needs extra reports for a DA. Both show on the planning certificate.

7. Note trees and slope

Significant trees, steep slopes and retaining walls affect cost and design. A survey shows levels and trees accurately.

8. Decide if you want to subdivide

If you plan to sell one home, check the subdivision rules early. In many areas a dual occupancy can be subdivided so each home has its own title, where the lot and the council rules allow it. Designing for it from day one saves redesigns later.

9. Pick the approval path

If your block and design meet every standard in the code, a complying development certificate (CDC) is faster. If not, it goes to council as a DA. Read our CDC vs DA guide.

CheckWhere to find it
Zoning and planning rulesSection 10.7 planning certificate
Lot size and widthTitle plan or survey
EasementsTitle search and deposited plan
SewerSydney Water sewer service diagram
Flood and bushfirePlanning certificate

Not sure where to start? Send us the address and we'll run the checks for you. Free, no obligation.

Not sure what your block allows?
Send us the address and we'll check it for you, free.
Check my block →

FAQs

What is the minimum lot size for a duplex in NSW?

A dual occupancy lodged as a DA can use a 400 m² minimum lot size. For a CDC, your council's LEP sets the minimum.

What is a Section 10.7 certificate?

A planning certificate issued by council that lists the zoning, planning rules and hazards (such as flooding and bushfire) that apply to a lot.

Can I build a duplex on a battle-axe block?

It is difficult, because each home in a dual occupancy generally needs its own frontage to a public road. Talk to us before you buy or design.

Sources
NSW Planning: Low and Mid-Rise Housing key provisions
NSW Planning Portal: Low Rise Housing Diversity Code
This guide is general information, not legal or planning advice. Rules change; check your planning certificate.
AE
Written by Aladdin Elmir
Licensed builder (354409C) and property developer. Medina Homes designs and builds custom homes, duplexes and dual occupancy across South West Sydney. Duplex builder
Keep reading

Related guides.

Got a block? Find out what you can build on it.

Send us the address. We'll check the zoning, size and frontage and tell you what can go there. Free, no obligation.

Licence 354409C · Custom design and build

Where should we send what we find?

We only use your details to reply.

Thanks, we've got it.Here's what happens next:
  1. We check the zoning, lot size, frontage and any easements or overlays on your block.
  2. Aladdin calls you to talk through what can go there and what you want to do with it.
  3. If it suits, we meet on site and start the design.